(000) 000-0000Start Your Project
Cantilever stairs

Concrete &Masonry CantileverStairs

When the wall is strong, the wall is the structure.

A poured concrete or reinforced block wall can carry cantilever treads directly. Each tread gets a steel core plate with threaded rods set in epoxy 6–8″ into the wall, so there is no stringer at all. Old brick is different: we never load it, and we build a new liner wall in front of it instead. From $52k in NJconfirm.

  • PE-stamped engineering
  • NYC & NJ permits handled
  • Hidden steel, no visible fixings
Cantilever stair anchored into a board-formed concrete wall, oak treads and a glass guard
Enquire
Scroll
What it is

Anchored straight into the wall.

In concrete, the treads need no stringer. A 1″ steel core plate inside every tread carries three or four ⅝–¾″ threaded rods that go 6–8″ into the wall in epoxy. We scan the wall for rebar and post-tension cables before drilling, and in New York City a special inspector checks the anchors before the treads go on.

6–8″Rod embedment in concrete
3–4Threaded rods per tread
0Stringers needed
Oak cantilever treads entering a board-formed concrete wall

Concrete wall · rods in epoxy, steel core in every tread

Three kinds of masonry.

What the wall is made of decides how we hold the treads.

Poured concrete and grouted block: The strongest base for a cantilever. Rods in epoxy into concrete at least 6–8″ t

01Poured concrete and grouted block

The strongest base for a cantilever. Rods in epoxy into concrete at least 6–8″ thick, or through-bolts into block whose cells are grouted solid and reinforced. Hollow block is grouted first.

No new wallThinnest build-up
Brick and brownstone: Unreinforced brick cannot take a concentrated load at every step, and a party wa

02Brick and brownstone

Unreinforced brick cannot take a concentrated load at every step, and a party wall is half your neighbor’s. We build a new framed or concrete liner wall in front of the brick and hide a steel stringer in it.

Brick never loadedNeighbor’s wall untouched

Will your wall carry it?

Pick your wall and tread width to see how we would hold the treads and what it adds. Our engineer confirms it on site.

Section through the wall · Typical
Your wall
Tread width
Verdict
Load at the wall
Typical extra
  • How we hold it
  • What changes
  • Tread

Load: 300 lb at the free edge of the tread, plus the tread's own weight.

Built to be looked at.

Nothing under the treads to hide behind. Every joint is drawn first.

Straight into concrete. No plates or gaps where the tread meets the wall.
Straight into concreteNo plates or gaps where the tread meets the wall.
Inside each tread. A steel core plate and threaded rods in epoxy.
Inside each treadA steel core plate and threaded rods in epoxy.
Light under every tread. Wiring cast or chased into the wall.
Light under every treadWiring cast or chased into the wall.
Brick stays unloaded. A new liner wall carries the stair.
Brick stays unloadedA new liner wall carries the stair.
Glass on the open side. Frameless panels on standoffs.
Glass on the open sideFrameless panels on standoffs.
Nothing under the treads but air.Engineered in New Jersey, installed across NYC, Long Island and New Jersey.

The stair, in numbers.

A typical 10′ floor-to-floor stair. Your PE-stamped drawings set the final sizes.

Steel core plates and threaded rods for treads anchored in concrete
ComponentSpecification
WallPoured concrete ≥ 6–8″, or reinforced CMU with grouted cells
Anchors3–4 threaded rods ⅝–¾″ per tread, epoxy, 6–8″ embedment
Tread core1″ steel plate inside 3¾″ solid wood
Before drillingGPR scan for rebar and post-tension cables
NYCSpecial inspection of adhesive anchors (BC Table 1705.3)
BrickNot loaded: new framed or concrete liner wall in front
Loads40 psf, plus 300 lb at the free edge of any tread
New constructionIf the concrete wall is still to be poured, we supply embedded steel plates for the formwork: the strongest and cleanest detail.
Board-formed concreteTreads read beautifully against board-formed or polished concrete. We drill after the finish so the wall stays perfect.
Hollow blockCells around each tread are grouted and reinforced first, or we add a hidden stringer.

What it costs.

Installed prices: design, PE engineering, steel, treads, delivery and installation. Permit fees and co-op deposits are billed at cost.

Concrete wall · straight
Concrete wall · straight
NJfrom $52kconfirm
NYCfrom $60k
  • 9–10′ floor to floor, 15 treads
  • Rods in epoxy, steel core treads
  • Oak over steel, 42″ × 3¾″
  • Cable or rod guard, wall handrail
Concrete Glass · most chosen
Concrete Glass · most chosen
NJ$62–80k
NYC$70–92k
  • Same stair
  • Frameless laminated glass guard
  • Glass around the upper-floor opening
  • Special inspection included in NYC

Brick or brownstone: the liner wall with a hidden stringer typically adds $8–15k and is quoted after we see the wall. Code requirements for NYC, Long Island and NJ are on the cantilever stairs page.

Before we begin.

Send a photo of your wall and we'll tell you what fits.

Can you do cantilever stairs in a concrete wall?

Yes. Poured concrete at least 6–8″ thick is the best wall for a cantilever. Each tread is held by threaded rods in epoxy through a steel core plate, with no stringer needed.

Can cantilever stairs go into brick?

Not directly. Old, unreinforced brick cannot take a concentrated load at every step. We build a new framed or concrete liner wall in front of the brick and carry the stair on steel hidden in it.

What about a brownstone party wall?

We never drill through it or load it: half of it belongs to your neighbor. The new liner wall stands on your side and carries the stair.

Does concrete block work?

Yes, when the cells are grouted solid and reinforced. Hollow block is grouted around each tread first, or we use a hidden stringer instead.

How much do concrete cantilever stairs cost?

From about $52k installed in New Jersey and $60k in New York City for a straight 9–10′ stair, anchors included. With frameless glass about $62–80k in NJ and $70–92k in NYC.

Do anchors need inspection in NYC?

Yes. Adhesive anchors in concrete need special inspection under NYC Building Code Table 1705.3. We arrange it and include it.

Get a price in 3 business days

Start your cantilever stair

Send your floor-to-floor height, a photo of the wall and a rough plan.

Your stair

Concrete & Masonry Walls cantilever

Get a quote
Cantilever stair anchored into a board-formed concrete wall, oak treads and a glass guard
Explore

A staircase shaped around your architecture.

Begin with your wall.

Discuss your project ↗
CallGet my price